Home Who We Are Raw Goat Milk Goats for Sale Contact Us
March 2, 2008 By Peter
Filed under: Construction,Goats,Oregon Weather

The goat house now has a floor, all its walls, and half a roof! It has also been jacked up and set back down on (scavenged, naturally) concrete blocks to prevent the wood beams from rotting in the Oregon moisture. The top 1/2 of 3 walls will be left open for ventilation and light, and shuttered during any cold winter storms.

Investment so far: about $50 for roof beams, screws, tar paper (partial rolls from a local construction materials reclamation facility called Bring Recycling.), and a roof vent (also from Bring).

Goathaus 20080303

1 Comment so far

  1. Looking good – when is the goat cam going in though?

    Jay SolisMar 3rd, 2008

    Reply to this comment

RSS feed for comments on this post.

Leave a reply

Comment Form